Assessment scope
- pile position, length, integrity and test evidence;
- measured total and differential settlement;
- soil model, groundwater and excavation influence;
- raft and superstructure stiffness;
- construction stage and neighbouring structures.
Possible responses
Monitoring and observational criteria, revised foundation model, load redistribution, additional piles, underpinning, local strengthening or an agreed construction sequence.